How To Fix BP741 - Existen distintas parametrizaciones para el control de disponibilidad


SAP Error Message - Details

  • Message type: E = Error

  • Message class: BP - Budgeting and planning

  • Message number: 741

  • Message text: Existen distintas parametrizaciones para el control de disponibilidad

  • Show details Hide details
  • ¿Qué causa este problema?

    You would like to execute a budget distribution from the investment
    program to several capital investment measures (orders or projects).
    The individual capital investment measures have different settings with
    regard to the availability control.

    Respuesta del sistema

    The system does not process the budget distribution.

    ¿Cómo arreglar este error?

    RESET N1
    Store in all subordinate capital investment measures of this capital
    investment program the same settings of the availability control. Also
    change the budget profiles belonging to it.
    <zh>Attention:</>
    Changes to a budget profile can have affects on further order orders or
    projects to which the budget profile is likewise assigned.
    Reconstruct for all orders and projects for which you have changed the
    profile and which are already budgeted the "Assigned values".
    For this choose in the Implementation Guide of the project system or of
    the overhead cost orders the work step "Reconstruct availability
    control".

    ¿Cómo puede suceder esto?

    You distribute budget to an order with availability control against
    annual budget and to a projekt with availability control against
    overall budget. Both capital investment measures therefore have
    different settings with regard to the availabiltiy control.
    Adjust the settings for example with regard to the availability
    control in the budget profile of the project to that of the order
    (remove "overall" indicator so that the availability control takes
    places against annual budget). For all projects affected by the budget
    profile change and already budgeted you have to reconstruct the assigned
    values.
    &hints&
    If you want to work at all costs with different settings with regard to
    the availability control for capital investment measures then you can
    change the type of this message (in the standard an "error message"
    appears) into a warning.
    Reconstruct in this case for <zh>every budget change</> on a capital
    investment measure the assigned values for this object as the system
    will otherwise not convey the budget changes to the availability
    control.
    In order to change the type of message choose the work step
    "<DS:SIMG.SIMG_CFMENUORK3OBA5>Change message control</>"
    (application area "BP", message number "741").

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP BP741 - Existen distintas parametrizaciones para el control de disponibilidad ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant