Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: AJ - Billing program
Message number: 103
Message text: La porción se ha modificado dentro del período de recálculo
You changed the portion from &v1& to &v2& for the contract. You made
this change within a backbilling period. However, you are not permitted
to change the portion within a backbilling period.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Ensure that the portion does not change within the backbilling period.
The current backbilling period started on &v3&. If you wish to allocate
the contract to a different portion, you can do this after the end of
the backbilling period.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
AJ103
- La porción se ha modificado dentro del período de recálculo ?Get instant SAP help. Sign up for our Free Essentials Plan.
AJ102
No se puede efectuar aún el cálculo final
¿Qué causa este problema? You have attempted to execute a period-end billing. You have specified in rate category &v1& that a minimum of &a...
AJ101
La cantidad de picos de potencia del operando &1 es cero
¿Qué causa este problema? During preprocessing of demand, the system has determined that no demand peaks have been defined for operand &v1&...
AJ104
La unidad de lectura se ha modificado dentro del período de recálculo
¿Qué causa este problema? You changed the meter reading unit from &v1& to &v2& for the contract. You made this change within a back...
AJ105
La porción se ha modificado dentro del período de cálculo final
¿Qué causa este problema? You changed the portion from &v1& to &v2& for the contract. You made this change within a period-end bill...
Haga clic en este enlace para buscar todos los mensajes de SAP.