Do you have any question about this error?
Message type: E = Error
Message class: AJ - Billing program
Message number: 103
Message text: La porción se ha modificado dentro del período de recálculo
You changed the portion from &v1& to &v2& for the contract. You made
this change within a backbilling period. However, you are not permitted
to change the portion within a backbilling period.
El sistema emite un mensaje de error y no le permitirá continuar con esta transacción hasta que se resuelva el error.
Ensure that the portion does not change within the backbilling period.
The current backbilling period started on &v3&. If you wish to allocate
the contract to a different portion, you can do this after the end of
the backbilling period.
Extracto de mensaje de error del sistema SAP. Copyright SAP SE.
AJ103
- La porción se ha modificado dentro del período de recálculo ?Get instant SAP help. Start your 7-day free trial now.
AJ102
No se puede efectuar aún el cálculo final
¿Qué causa este problema? You have attempted to execute a period-end billing. You have specified in rate category &v1& that a minimum of &a...
AJ101
La cantidad de picos de potencia del operando &1 es cero
¿Qué causa este problema? During preprocessing of demand, the system has determined that no demand peaks have been defined for operand &v1&...
AJ104
La unidad de lectura se ha modificado dentro del período de recálculo
¿Qué causa este problema? You changed the meter reading unit from &v1& to &v2& for the contract. You made this change within a back...
AJ105
La porción se ha modificado dentro del período de cálculo final
¿Qué causa este problema? You changed the portion from &v1& to &v2& for the contract. You made this change within a period-end bill...
Haga clic en este enlace para buscar todos los mensajes de SAP.