How To Fix 54290 - El número de centro &1 no es correcto


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 54 - Messages for HR tables

  • Message number: 290

  • Message text: El número de centro &1 no es correcto

  • Show details Hide details
  • ¿Qué causa este problema?

    The company number must be checked when it is entered. The check proved
    that the number is incorrect.
    The following checks must be made:
    The first three digits must be 010 to 099 or greater than 110.
    The last digit of the company number is the check digit. Both the check
    digit calculated and the last digit from the total of check digits and
    the constant 5 can be used.
    The check digit is calculated in the following way:
    The company number digits (digits 1 to 7) are, starting with the first
    digit, multiplied with the factors 1, 2, 1, 2, 1, 2, 1.
    The sum of the digits is calculated from the individual products.
    The sums of the digits are added together.
    The total is divided by 10.
    The remaining amount is the check digit.

    Extracto de mensaje de error del sistema SAP. Copyright SAP SE.


Smart SAP Assistant

  • ¿Cuál es la causa y la solución del error de SAP 54290 - El número de centro &1 no es correcto ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Mensajes de error de SAP relacionados

Haga clic en los enlaces a continuación para ver los siguientes mensajes relacionados:

Haga clic en este enlace para buscar todos los mensajes de SAP.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant