How To Fix WXP645 - Break-down &2 must be the plant dimension


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WXP - Retail Planning

  • Message number: 645

  • Message text: Break-down &2 must be the plant dimension

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WXP645 - Break-down &2 must be the plant dimension ?
    Certainly! Here's detailed information about the SAP error message WXP645:
    
    SAP Error Message: WXP645 - Break-down &2 must be the plant dimension
    
    Meaning / 
    Cause: This error occurs in SAP when you are working with costing-based Profitability Analysis (CO-PA) or Product Costing and the system expects the plant to be used as a characteristic (dimension) in the break-down structure, but it is missing or incorrectly assigned. The message indicates that the break-down structure (used in costing or profitability analysis) must include the plant as one of the dimensions. The system requires the plant dimension to correctly allocate or analyze costs or revenues. This usually happens when defining or changing the break-down structure in CO-PA or in costing variants, and the plant is either omitted or replaced by another dimension. When does it occur? During configuration or execution of costing runs. When defining or modifying the break-down structure in CO-PA. When the system tries to allocate costs or revenues but cannot

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant