Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WXP569 - Planning step &1 cannot be used for SAP BW


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WXP - Retail Planning

  • Message number: 569

  • Message text: Planning step &1 cannot be used for SAP BW

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WXP569 - Planning step &1 cannot be used for SAP BW ?

    SAP Error Message:
    WXP569 Planning step &1 cannot be used for SAP BW


    Cause:

    This error occurs when you try to use a planning step that is not compatible with SAP BW (Business Warehouse). Specifically, the planning step you are attempting to use is designed for SAP Business Planning and Consolidation (BPC) or other planning applications but is not supported or allowed in the BW environment.

    In SAP BW, planning steps are used in the context of BW Integrated Planning (BW-IP). If a planning step is created or configured incorrectly, or if you try to use a planning step from a different planning environment (like BPC) directly in BW, the system will raise this error.


    Explanation:

    • Planning Step: A planning step is a unit of planning activity in BW-IP, representing a set of planning functions and data slices.
    • SAP BW Compatibility: Not all planning steps or planning objects are compatible with BW-IP. Some planning steps are specific to other SAP planning tools.
    • The error message indicates that the planning step you are trying to use is not valid or cannot be executed in the BW system.

    Solution:

    1. Check Planning Step Type:

      • Verify that the planning step you are trying to use is created and maintained in SAP BW Integrated Planning.
      • Use transaction RSPLAN or RSBBS to check the planning step details.
    2. Create/Use Correct Planning Step:

      • If the planning step is from BPC or another system, create a new planning step in BW-IP that is compatible.
      • Ensure the planning step is assigned to the correct InfoProvider and planning sequences.
    3. Transport and System Consistency:

      • If you transported planning steps from another system, ensure that the transport was done correctly and that all dependencies are met.
      • Sometimes, inconsistencies in transport can cause this error.
    4. Check Authorization and Roles:

      • Make sure you have the necessary authorizations to use or execute the planning step.
    5. Consult SAP Notes:

      • Check SAP Notes for any known issues related to planning steps and BW compatibility.
      • For example, SAP Note 0000000 (replace with actual note number if found) might provide patches or corrections.

    Related Information:

    • Transactions:

      • RSPLAN – Planning Step Maintenance
      • RSBBS – BW Planning Sequences
      • RSPLS – Planning Sequences
      • RSA1 – Data Warehousing Workbench (to check InfoProviders)
    • SAP BW Integrated Planning:

      • Planning steps are part of BW-IP and are used to define planning activities.
      • Planning steps must be created and maintained within BW-IP to be valid.
    • SAP BPC vs BW-IP:

      • BPC (Business Planning and Consolidation) uses different planning objects and steps.
      • Direct use of BPC planning steps in BW-IP is not supported.

    Summary:

    The error WXP569 Planning step &1 cannot be used for SAP BW means the planning step is incompatible with BW-IP. To resolve, ensure you use planning steps created and maintained within BW Integrated Planning, verify system consistency, and avoid mixing planning objects from different SAP planning tools.


    If you provide the exact planning step name or context, I can help you with more specific guidance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant