Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix WXP425 - Enter a complete planning period


SAP Error Message - Details

  • Message type: E = Error

  • Message class: WXP - Retail Planning

  • Message number: 425

  • Message text: Enter a complete planning period

  • Show details Hide details
  • What causes this issue?

    The analysis period required for creating a planning hierarchy is only
    partially maintained. The analysis period is required for evaluating
    target or actual data.

    System Response

    INCLUDE ISR_VERARBEITUNG OBJECT DOKU ID TX

    How to fix this error?

    Fill the fields for the analysis period.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message WXP425 - Enter a complete planning period ?

    SAP Error Message:
    WXP425 - Enter a complete planning period


    Cause:

    This warning message appears in SAP when you are working with planning periods (e.g., in Demand Planning, Forecasting, or other planning-related transactions) and the system detects that the planning period you have entered is incomplete or not fully specified. Typically, this means that either the start or end date of the planning period is missing, or the period does not cover a full, valid range as expected by the system.

    For example, if you are entering a planning period for a forecast and you specify only a start date without an end date, or the period does not align with the expected calendar intervals (like fiscal periods, weeks, or months), SAP will issue this warning.


    Solution:

    • Enter both start and end dates: Make sure you specify a complete planning period by entering both the start and end dates.
    • Use valid period intervals: Ensure that the planning period corresponds to valid calendar or fiscal periods as defined in your system (e.g., full months, weeks, or quarters).
    • Check period format: Verify that the period format matches the expected format (e.g., YYYYMM for monthly periods).
    • Review planning horizon settings: Sometimes, the planning horizon or period definitions in customizing (SPRO) might restrict the valid periods. Check and adjust if necessary.
    • Use transaction-specific help: Some planning transactions provide F1 help or value help (F4) for entering periods correctly.

    Related Information:

    • Transactions: This message commonly appears in transactions related to planning such as:
      • Demand Planning (transaction /SAPAPO/SDP94, /SAPAPO/DP94)
      • Forecasting
      • Production Planning
      • Material Requirements Planning (MRP)
    • Configuration:
      • Check the planning calendar and period definitions in customizing under Logistics ? Production ? Demand Management ? Planning Calendar or relevant APO customizing.
    • SAP Notes:
      • If the issue persists despite correct input, check for SAP Notes related to WXP425 for your SAP version.
    • Message Class: WXP (related to APO planning)

    Summary:

    WXP425 warns you to enter a complete and valid planning period. To resolve it, ensure both start and end dates are entered, and the period aligns with your system’s calendar/fiscal definitions.


    If you provide the exact transaction or context where you encounter this message, I can give more tailored advice.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant