Message type: E = Error
Message class: WXP - Retail Planning
Message number: 110
Message text: A planning step cannot be linked to itself
You attempted to link a planning step to the same planning link. This
type of planning step link is not possible.
The link is not created.
Select one of the following procedures:
If you want to define a link between two steps, select <zh>"Link"</>
and draw a line from the source planning step to the target planning
step.
If you want to execute automatic processing for a planning step, go to
the desired planning step in detailed screen and create
<DS:DE.WISP_MASCHPL>automatic planning</>.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
WXP110
- A planning step cannot be linked to itself ?Certainly! Here's a detailed explanation for the SAP error message WXP110: "A planning step cannot be linked to itself":
Error Message:
WXP110 - A planning step cannot be linked to itself
Cause:
This error occurs in SAP Production Planning (PP) or Product Cost Planning (PCP) when you try to create a link (or relationship) between a planning step and itself. In other words, the system prevents you from assigning a planning step as a predecessor or successor to itself because this would create a circular reference or logical inconsistency in the planning sequence.
Planning steps are used in routing or production versions to define the sequence of operations or steps in production. Linking a step to itself would mean the step depends on itself, which is logically impossible and would cause errors in scheduling or costing.
When does it typically occur?
Check the Planning Step Links:
Correct the Link:
Use Transaction Codes:
Check for Circular References:
If the error occurs during data upload or migration:
Aspect | Details |
---|---|
Error | WXP110 - A planning step cannot be linked to itself |
Cause | Attempt to link a planning step as predecessor or successor to itself |
Solution | Remove or correct the self-link in routing/planning step relationships |
Where to Check | Routing (CA02), Production Versions (C223) |
Impact | Prevents logical inconsistencies in production planning and scheduling |
If you need help identifying the exact planning step causing the issue, you can enable debugging or check the detailed error log in the system to find the step number involved.
Let me know if you need assistance with specific transaction steps or further troubleshooting!
Get instant SAP help. Sign up for our Free Essentials Plan.
WXP109
The selected objects have been flagged for deletion
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WXP108
Planning step &1 already exists. Select a different name
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WXP111
Caution: planning scenario &1 is not yet activated
What causes this issue? You want to go to <DS:GLOS.36BB0C94F8A203E4E10000009B38F9B6>planning hierarchy</> maintenance. <DS:DE.WISP_PLS...
WXP112
Planning scenario &1 is already active
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...