Do you have any question about this error?
Message type: E = Error
Message class: WW - Material group master maintenance
Message number: 641
Message text: & was reclassified from & to level &
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
WW641
- & was reclassified from & to level & ?The SAP error message WW641 typically relates to issues with work center capacity planning or scheduling. The message indicates that a work center has been reclassified from one level to another, which can affect production planning and scheduling processes.
Cause:
- Capacity Issues: The work center may have insufficient capacity to handle the planned workload, leading to a reclassification.
- Configuration Changes: Changes in the configuration of the work center, such as shifts, available resources, or production rates, can trigger this message.
- Master Data Errors: Incorrect or incomplete master data for the work center, such as incorrect capacity or scheduling parameters, can lead to this error.
- Production Order Changes: Changes in production orders that affect the scheduling or capacity of the work center can also cause this message.
Solution:
- Review Work Center Configuration: Check the configuration of the work center in the SAP system. Ensure that the capacity, shifts, and other parameters are correctly set up.
- Adjust Capacity Planning: If the work center is overloaded, consider redistributing the workload or increasing the capacity of the work center.
- Check Master Data: Verify that all relevant master data for the work center is accurate and complete. This includes checking the routing, production versions, and any related data.
- Analyze Production Orders: Review any recent changes to production orders that may have impacted the work center's capacity. Adjust the orders as necessary.
- Consult SAP Notes: Look for any relevant SAP Notes or documentation that may provide additional insights or solutions for this specific error message.
Related Information:
CR01
(Create Work Center), CR02
(Change Work Center), or CM01
(Capacity Planning) to investigate and resolve the issue.If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP production planning and scheduling.
Get instant SAP help. Start your 7-day free trial now.
WW640
&
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WW639
&
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WW642
The version tree could not be saved. Internal error.
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
WW643
This change version has no objects to be reclassified
What causes this issue? There is no object for reclassification in the specified change version.System Response The system issues an error message a...
Click on this link to search all SAP messages.