Message type: E = Error
Message class: WAB - Messages Settlement Management
Message number: 169
Message text: Error when determining the parallel resources
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
WAB169
- Error when determining the parallel resources ?The SAP error message WAB169 indicates an issue with determining parallel resources in the context of work scheduling or resource planning. This error typically arises in the SAP system when there is a problem with the configuration or availability of resources needed for a particular operation or task.
Cause:
- Resource Configuration Issues: The resources may not be properly configured in the system. This could include missing or incorrect settings for the resource master data.
- Capacity Constraints: The system may not find any available capacity for the resources required for the operation, leading to the inability to determine parallel resources.
- Scheduling Conflicts: There may be scheduling conflicts where the resources are already allocated to other tasks or operations.
- Missing Master Data: Required master data for the resources, such as work centers or production resources/tools, may be incomplete or missing.
- Incorrect Planning Parameters: The planning parameters set in the system may not align with the requirements of the operation.
Solution:
- Check Resource Configuration: Verify that the resources are correctly configured in the system. Ensure that all necessary parameters, such as capacity, availability, and scheduling details, are correctly set up.
- Review Capacity Planning: Check the capacity planning for the resources to ensure that they are available for the required time slots. Adjust the capacity if necessary.
- Analyze Scheduling Conflicts: Look for any existing operations that may be using the resources at the same time. Resolve any conflicts by rescheduling or reallocating resources.
- Validate Master Data: Ensure that all relevant master data for work centers and production resources/tools is complete and accurate. Update any missing or incorrect information.
- Adjust Planning Parameters: Review and adjust the planning parameters in the system to ensure they are appropriate for the operations being scheduled.
Related Information:
CR01
(Create Work Center), CR02
(Change Work Center), or CM01
(Capacity Planning) to manage and review resource configurations.By following these steps, you should be able to identify and resolve the cause of the WAB169 error in your SAP system.
Get instant SAP help. Sign up for our Free Essentials Plan.
WAB168
Process lock is not supported for parallel processing on document level
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WAB167
Only &1 of &2 documents can be processed due to missing authority
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WAB170
Processing terminated due to RFC error
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
WAB171
Report &1 was terminated. &2 of &3 documents were parallel processed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.