How To Fix W+309 - Earliest possible date is &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: W+ -

  • Message number: 309

  • Message text: Earliest possible date is &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message W+309 - Earliest possible date is & ?

    The SAP error message W+309, which states "Earliest possible date is &," typically occurs in the context of scheduling or planning within SAP, particularly in modules like Production Planning (PP) or Materials Management (MM). This error indicates that the system cannot schedule a task or order before a certain date due to various constraints.

    Cause:

    1. Lead Time Constraints: The lead time for production or procurement may not allow for scheduling before the specified date.
    2. Availability of Resources: Resources (like materials, machines, or labor) may not be available before the indicated date.
    3. Calendar Settings: The factory calendar or work schedule may restrict operations on certain dates.
    4. Order Dependencies: There may be dependencies on other orders or tasks that must be completed before the current one can start.
    5. Material Availability: The required materials may not be available until the specified date.

    Solution:

    1. Check Lead Times: Review the lead times set for the materials or production processes involved. Adjust them if necessary.
    2. Resource Availability: Ensure that all required resources are available and scheduled correctly. If not, consider rescheduling or reallocating resources.
    3. Review Calendar Settings: Check the factory calendar and work schedules to ensure that they allow for operations on the desired dates.
    4. Adjust Order Dependencies: If there are dependencies, ensure that preceding orders are completed on time or adjust the scheduling accordingly.
    5. Material Planning: Ensure that all necessary materials are procured in advance. If materials are not available, consider expediting orders or finding alternative sources.

    Related Information:

    • Transaction Codes: You may use transaction codes like MD04 (Stock/Requirements List) or CO01 (Create Production Order) to analyze the situation further.
    • SAP Notes: Check SAP Notes for any known issues or updates related to this error message.
    • Documentation: Refer to SAP documentation for detailed information on scheduling and planning processes.
    • Consult with SAP Support: If the issue persists, consider reaching out to SAP support for assistance.

    By addressing the underlying causes and following the suggested solutions, you should be able to resolve the W+309 error and successfully schedule your tasks or orders.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant