Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: VV - Requirements and availability
Message number: 503
Message text: Planning material & is locked (assignment check not possible)
The <GL:planning_material>planning material</> &V1& (plant &V2&)
belonging to material &V4& which you are processing is blocked by user
&V3&. The system has attempted several times without success to block
this material.
So as not to slow your work, the system stops its attempts at blocking
and does not carry out an assignment check.
Note that the transaction you are processing is not confirmed. You
should therefore carry out another assignment check
<DS:GLOS.availability_check>(availability check)</>.
Error message extract from SAP system. Copyright SAP SE.
VV503
- Planning material & is locked (assignment check not possible) ?The SAP error message "VV503 Planning material & is locked (assignment check not possible)" typically occurs in the context of material planning and indicates that the material you are trying to work with is currently locked for some reason. This can happen in various scenarios, such as during a planning run, when a user is editing the material, or when there are ongoing transactions that prevent changes.
Causes:
- Material Locking: The material is locked by another user or process. This can happen if someone is currently editing the material or if a planning run is in progress.
- Transaction in Progress: There may be ongoing transactions that are preventing the material from being accessed for planning purposes.
- User Authorization: The user may not have the necessary authorizations to access or modify the material.
- System Configuration: There may be configuration settings in the system that are causing the material to be locked.
Solutions:
- Check Lock Entries: Use transaction code
SM12
to check for lock entries related to the material. If you find that the material is locked by another user, you may need to wait until the lock is released or contact the user to resolve the issue.- Review Ongoing Transactions: Ensure that there are no ongoing transactions that might be locking the material. If a planning run is in progress, you may need to wait for it to complete.
- User Authorization: Verify that you have the necessary authorizations to access and modify the material. If not, contact your SAP security team to request the appropriate access.
- Check Configuration: Review the configuration settings related to material planning to ensure that there are no settings that might be causing the lock.
- Restart the Session: Sometimes, simply logging out and back into the SAP system can resolve temporary locking issues.
Related Information:
SM12
(to check locks), MM03
(to view material details), and MD04
(to view stock/requirements list).If the issue persists after trying the above solutions, it may be necessary to involve your SAP Basis team or technical support for further investigation.
Get instant SAP help. Sign up for our Free Essentials Plan.
VV502
Material & is locked (availability check not possible)
What causes this issue? Material &V1& (plant &V2&) which you are processing is blocked by user &V3&. The system has attempted...
VV501
Blocking error
What causes this issue? A system error occured during the attempt to block the material you are processing.System Response It can be assumed that pr...
VV504
Overflow of the block table during transfer of results
What causes this issue? During the transfer of the results of the <GL:availability_check>availability check</> the number of entries in t...
VV505
Material & is blocked (Blocking table has not been updated)
What causes this issue? Material &V1& (Plant &V2&) which you have processed is blocked by User &V3&. The system has already m...
Click on this link to search all SAP messages.