Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix VKK_BAPI_PPLAN021 - Early ending for &1 created with required amount &2 &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: VKK_BAPI_PPLAN - Payment Plan Items BAPIs

  • Message number: 021

  • Message text: Early ending for &1 created with required amount &2 &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message VKK_BAPI_PPLAN021 - Early ending for &1 created with required amount &2 &3 ?

    The SAP error message VKK_BAPI_PPLAN021 typically indicates that there is an issue with the planning process in the context of sales and distribution (SD) or production planning. The message suggests that an early ending occurred for a planning item, and it provides details about the required amount that was not met.

    Cause:

    The error message can be triggered by several factors, including:

    1. Insufficient Stock: The required quantity for a sales order or production order cannot be fulfilled due to insufficient stock.
    2. Planning Parameters: Incorrect or incomplete planning parameters may lead to the system being unable to calculate the required quantities properly.
    3. Master Data Issues: Problems with master data, such as material master records, bill of materials (BOM), or routing, can cause discrepancies in planning.
    4. Configuration Issues: Incorrect configuration in the planning settings or in the related modules (like SD or PP) can lead to this error.
    5. Data Inconsistencies: Inconsistencies in the data, such as missing or incorrect entries in the planning tables, can also trigger this error.

    Solution:

    To resolve the VKK_BAPI_PPLAN021 error, you can take the following steps:

    1. Check Stock Levels: Verify the stock levels for the materials involved. Ensure that there is enough stock to meet the required quantities.
    2. Review Planning Parameters: Check the planning parameters and settings in the system. Ensure that they are correctly configured for the planning process you are executing.
    3. Validate Master Data: Review the master data for the materials involved. Ensure that the material master, BOM, and routing are correctly set up and contain all necessary information.
    4. Analyze Configuration: Check the configuration settings in the relevant modules (SD, PP) to ensure they are set up correctly for your business processes.
    5. Data Consistency Check: Run consistency checks on the planning data to identify any discrepancies or missing entries that could be causing the issue.
    6. Consult Logs: Look at the application logs or system logs for more detailed error messages or warnings that could provide additional context for the issue.

    Related Information:

    • Transaction Codes: You may use transaction codes like MD04 (Stock/Requirements List) or MD02 (MRP Run) to analyze stock and requirements.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message. SAP Support may have specific notes addressing this error.
    • Documentation: Review SAP documentation related to planning processes in SD and PP for best practices and troubleshooting steps.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide deeper insights into the specific configuration and data setup in your SAP environment.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker