Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: V5 - Contract processing
Message number: 050
Message text: Determined desired delivery date & has been copied to schedule line
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
V5050
- Determined desired delivery date & has been copied to schedule line ?The SAP error message V5050 typically indicates that the system has determined a desired delivery date for a sales order item and has copied it to the schedule line. This message is not necessarily an error but rather an informational message that indicates the system's processing of the delivery date.
Cause:
- Delivery Date Calculation: The system calculates the desired delivery date based on various factors such as availability of materials, lead times, and shipping conditions.
- Sales Order Configuration: The configuration of the sales order may lead to the system determining a delivery date automatically.
- Material Availability: The availability of the material can influence the delivery date, especially if the material is not in stock or has a long lead time.
Solution:
- Review Sales Order: Check the sales order details to ensure that the desired delivery date is appropriate and meets customer expectations.
- Check Material Availability: Verify the availability of the materials associated with the sales order. If materials are not available, consider adjusting the order or sourcing materials from other locations.
- Adjust Lead Times: If the lead times are too long, consider reviewing and adjusting them in the material master or in the sales order configuration.
- Consult Configuration: If the message is unexpected, consult with your SAP configuration team to ensure that the settings for delivery date determination are correct.
Related Information:
If you are facing issues beyond this informational message, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in sales and distribution (SD) processes.
Get instant SAP help. Sign up for our Free Essentials Plan.
V5049
The contract end date fulfills the valid cancellation rules
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
V5048
Due to missing data, data was not checked or determined
System Response Due to missing data, no check or data determination was carried out. The system issues an error message and will not allow you to con...
V5051
The rule for sales activity will be deleted
What causes this issue? Whe you changed the activity date, the activity date generated by the rule no longer agreed with the date you entered.System ...
V5052
The system could not determine the contract start date
What causes this issue? You have either entered or changed the rule for contract start dates. The system cannot determine the contract start date for...