Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 804
Message text: Period cons. and meter readings cannot be changed at the same time
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message TU804 ("Period cons. and meter readings cannot be changed at the same time") typically occurs in the context of utility billing or contract accounts when there is an attempt to change both the consumption period and the meter readings simultaneously. This is not allowed because it can lead to inconsistencies in billing and reporting.
Cause:
Simultaneous Changes: The error arises when a user tries to update both the consumption period and the meter readings in a single transaction. SAP restricts this to maintain data integrity.
Configuration Issues: There may be specific configurations in the SAP system that enforce this restriction based on business rules or settings.
Data Entry Errors: Users may inadvertently attempt to make both changes without realizing the restriction.
Solution:
Separate Transactions: To resolve the error, you should perform the changes in two separate transactions:
First, update the meter readings.
After successfully saving the meter readings, then update the consumption period.
Check Configuration:
Get instant SAP help. Sign up for our Free Essentials Plan.
TU803 Payment scheme &1 cannot be processed with this transaction
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TU802 Payment plan &1 cannot be processed with this transaction
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TU805 Period cons., MR and BB amount cannot be changed at the same time
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
TU806 Extrapolation for contract &1 was successful
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.