Do you have any question about this error?
Message type: E = Error
Message class: TU - Billing/Scheduling/Budget Billing
Message number: 155
Message text: Interval 'MR-end MR per.' changed from &1 to permissible value &2
In the meter reading dates the end of the meter reading period was
changed to a date that is after the original date. This causes the
scheduled reading date to change when the schedule records are
generated. Because the scheduled reading date must not be before the
scheduled billing date, the interval has been changed.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
TU155
- Interval 'MR-end MR per.' changed from &1 to permissible value &2 ?Get instant SAP help. Start your 7-day free trial now.
TU154
Allocation date must be earlier than or equal to &1
What causes this issue? The specified limiting date corresponds to the target reading date. It is calculated by subtracting the interval between mete...
TU153
If you enter a 'Factory cal.ID' you must also maintain 'Corr.holiday' fld
What causes this issue? If there is an entry in the 'Factory cal.ID' field there must also be an entry in the 'Corr. holiday' fie...
TU156
Meter reading unit &1 is still used in installations
What causes this issue? The meter reading unit you wish to delete is still used in installtions. Deletion is therefore not permitted. To determine th...
TU157
Parameter record &1 is still used in portions
What causes this issue? You have attempted to delete parameter record &V1&. This is not possible since this parameter record is still used in...
Click on this link to search all SAP messages.