Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix T8069 - Horizon must be greater than start date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: T8 - Analysis system evaluations

  • Message number: 069

  • Message text: Horizon must be greater than start date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message T8069 - Horizon must be greater than start date ?

    The SAP error message T8069, which states "Horizon must be greater than start date," typically occurs in the context of planning or forecasting activities within SAP, particularly in modules like SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO). This error indicates that the planning horizon you are trying to set is not valid because it does not extend beyond the specified start date.

    Cause:

    1. Incorrect Date Configuration: The planning horizon you are trying to set is either equal to or less than the start date. This can happen if the dates are incorrectly entered or if there is a misunderstanding of the required date range.
    2. System Settings: The system may have specific settings or configurations that dictate the acceptable range for planning horizons, which may not be aligned with the dates you are trying to use.
    3. Data Entry Errors: Manual entry errors when inputting the start date or horizon date can lead to this issue.

    Solution:

    1. Check Dates: Review the start date and the horizon date you are trying to set. Ensure that the horizon date is indeed greater than the start date.
    2. Adjust Planning Horizon: If the horizon is set incorrectly, adjust it to ensure it extends beyond the start date. For example, if your start date is January 1, 2023, your horizon should be set to a date later than January 1, 2023.
    3. Review Configuration: If you are unsure about the acceptable date ranges, consult your system configuration settings or documentation to understand the requirements for planning horizons.
    4. Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on setting planning horizons in your version of SAP.
    5. Seek Support: If the issue persists after checking the dates and configurations, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional context.
    • User Guides: Review user guides or training materials related to the planning module you are using, as they may provide insights into proper date handling.
    • Community Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to resolve the T8069 error and successfully set your planning horizon.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker