How To Fix SI031 - Max. no. records for MS Project V. 4.0 exceeded (9,999 activities)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: SI - Implementation Guide - Status control

  • Message number: 031

  • Message text: Max. no. records for MS Project V. 4.0 exceeded (9,999 activities)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message SI031 - Max. no. records for MS Project V. 4.0 exceeded (9,999 activities) ?

    The SAP error message SI031 indicates that the maximum number of records (activities) for Microsoft Project version 4.0 has been exceeded. Specifically, this error occurs when you attempt to import or export a project that contains more than 9,999 activities, which is the limit set by Microsoft Project 4.0.

    Cause:

    • The primary cause of this error is that the project you are working with has more than 9,999 activities. Microsoft Project 4.0 has a hard limit on the number of activities it can handle, and exceeding this limit results in the SI031 error.

    Solution:

    To resolve this error, you can consider the following solutions:

    1. Reduce the Number of Activities:

      • Review your project and see if you can consolidate or eliminate some activities. This may involve breaking down larger tasks into smaller ones or combining similar tasks.
    2. Split the Project:

      • If the project is too large, consider splitting it into multiple smaller projects. Each smaller project should have fewer than 9,999 activities, allowing you to manage them separately.
    3. Upgrade Microsoft Project:

      • If feasible, consider upgrading to a newer version of Microsoft Project. Newer versions have higher limits for the number of activities and can handle larger projects more effectively.
    4. Use Alternative Tools:

      • If you frequently work with large projects, consider using project management tools that can handle a larger number of activities without limitations.
    5. Check for Duplicates:

      • Ensure that there are no duplicate activities in your project that could be contributing to the count.

    Related Information:

    • Microsoft Project Versions: Different versions of Microsoft Project have different limitations. For example, later versions (like Microsoft Project 2010 and beyond) support many more tasks and resources.
    • SAP Integration: If you are using SAP to manage project data, ensure that your integration settings are configured correctly and that you are using compatible versions of both SAP and Microsoft Project.
    • Documentation: Refer to the official documentation for both SAP and Microsoft Project for specific guidelines on project limits and best practices for managing large projects.

    By following these steps, you should be able to address the SI031 error and manage your project effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author