Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 882
Message text: The order was brought forward to the &1 at &2 o'clock
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ882
- The order was brought forward to the &1 at &2 o'clock ?The SAP error message
/SAPAPO/SEQ882
indicates that an order has been brought forward to a specific time, which can occur in the context of Advanced Planning and Optimization (APO) in SAP. This message typically arises in scenarios involving production planning, scheduling, or order management.Cause:
The error message
/SAPAPO/SEQ882
is usually triggered when:
- Order Rescheduling: An order is rescheduled to an earlier time than originally planned, which may conflict with other orders or resources.
- Capacity Constraints: There may be capacity constraints in the production environment that prevent the order from being processed at the desired time.
- Planning Parameters: The planning parameters or settings in the APO system may not be configured correctly, leading to unexpected scheduling behavior.
- Dependencies: There may be dependencies or constraints related to other orders or resources that affect the scheduling of the order.
Solution:
To resolve the issue, consider the following steps:
- Check Order Details: Review the details of the order that has been brought forward. Look for any dependencies or constraints that may have caused the rescheduling.
- Review Capacity: Ensure that there is sufficient capacity available for the order at the new time. If not, you may need to adjust the production schedule or allocate additional resources.
- Adjust Planning Parameters: Review and adjust the planning parameters in the APO system to ensure they align with your production requirements and constraints.
- Re-schedule Manually: If necessary, manually reschedule the order to a time that is feasible based on current capacity and resource availability.
- Consult Documentation: Refer to SAP documentation or help resources for more specific guidance related to your version of SAP APO and the context in which the error occurred.
Related Information:
/SAPAPO/SDP94
for planning board or /SAPAPO/ORDR
for order management.If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who specializes in SAP APO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SEQ881
No new position could be found for the order
What causes this issue? You tried bringing forward a late order. However, the system could not find any earlier position in the order sequence.System...
/SAPAPO/SEQ880
Function is only possible in change mode
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ883
The item does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ885
The sum of the predefined values does not add up to 100%
What causes this issue? The four values you entered for the size of the four charts do not add up to 100%.System Response The system cannot determin...
Click on this link to search all SAP messages.