Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 528
Message text: Calculate period length(s) according to reference calendar &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ528
- Calculate period length(s) according to reference calendar &1 ?The SAP error message /SAPAPO/SEQ528 typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue with the calculation of period lengths based on a reference calendar. This error can arise during planning activities, such as when trying to execute a planning run or when working with planning books.
Cause: The error message /SAPAPO/SEQ528 indicates that the system is unable to calculate the period lengths for the specified reference calendar. This can happen due to several reasons, including: Incorrect Reference Calendar: The reference calendar specified may not be correctly defined or may not exist in the system. Missing or Incomplete Data: There may be missing data related to the calendar, such as holidays or working days that are not properly configured.
Configuration Issues: There could be issues with the configuration of the planning area or the planning book that is being used. Time Periods Not Defined: The time periods for
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SEQ527
Orders for &1 pieces are scheduled for the end of the horizon
What causes this issue? There are the following possible causes depending on the setting in the planning basis field: Order-orientated There are more...
/SAPAPO/SEQ526
There are late, uncovered requirements of &1 pieces
What causes this issue? Requirements that cannot be covered on time exist in or before the horizon. This can occur if 1. . . . uncovered requirements...
/SAPAPO/SEQ529
Check planning situation in the total horizon
What causes this issue? Before planning can be carried out, several prerequisites have to be checked. No (partially) backflushed orders may lie in th...
/SAPAPO/SEQ530
Procedure package &1 (&2)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.