Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 326
Message text: Limit the planning horizon to fewer days or shifts
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ326
- Limit the planning horizon to fewer days or shifts ?The SAP error message
/SAPAPO/SEQ326
indicates that the planning horizon set for a specific planning scenario in SAP Advanced Planning and Optimization (APO) is too long. This error typically arises when the system is unable to process the planning data due to the defined time frame exceeding the limits set in the system configuration.Cause:
- Excessive Planning Horizon: The planning horizon defined in the planning book or in the configuration settings exceeds the maximum allowed days or shifts for the planning process.
- System Configuration: The settings in the APO system may not be configured to handle the specified planning horizon, leading to performance issues or data processing limitations.
- Data Volume: A large volume of data over an extended period can lead to performance degradation, causing the system to restrict the planning horizon.
Solution:
Adjust the Planning Horizon:
- Go to the planning book or the relevant configuration settings and reduce the number of days or shifts in the planning horizon.
- Ensure that the planning horizon is within the limits set by the system.
Check Configuration Settings:
- Review the configuration settings in the APO system, particularly those related to the planning horizon and data processing limits.
- You may need to consult with your SAP Basis or APO configuration team to adjust these settings if necessary.
Optimize Data Volume:
- If the planning horizon needs to be extended, consider optimizing the data volume being processed. This could involve archiving old data or filtering out unnecessary data from the planning process.
Consult Documentation:
- Refer to SAP documentation or notes related to the specific version of APO you are using for any additional guidelines or recommendations regarding planning horizons.
Testing:
- After making adjustments, test the planning process to ensure that the error does not reoccur and that the system performs as expected.
Related Information:
By addressing the planning horizon and ensuring it aligns with system capabilities, you should be able to resolve the /SAPAPO/SEQ326
error effectively.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SEQ325
Function only possible in display mode
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ324
The takt-based scheduling requires more capacity
What causes this issue? The system cannot schedule all orders in the horizon selected because there is insufficient capacity available. The capacity ...
/SAPAPO/SEQ327
Scheduling not possible because not enough takts are free
What causes this issue? There are not enough free takts in the horizon you have currently selected to be able to transfer the orders to be scheduled....
/SAPAPO/SEQ328
Drag/Drop from "deallocated" to "deallocated" not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.