How To Fix /SAPAPO/DM_VERS_MGMT120 - Resource networks copied to planning version &


/SAPAPO/DM_VERS_MGMT120 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/DM_VERS_MGMT -

  • Message number: 120

  • Message text: Resource networks copied to planning version &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/DM_VERS_MGMT120 - Resource networks copied to planning version & ?
    The SAP error message /SAPAPO/DM_VERS_MGMT120 typically indicates an issue related to the copying of resource networks to a planning version in SAP Advanced Planning and Optimization (APO). This error can occur during the process of version management when trying to copy data from one planning version to another.
    
    Cause: The error can be caused by several factors, including: Inconsistent Data: There may be inconsistencies in the resource networks that are being copied, such as missing or incorrect data. Version Locking: The target planning version may be locked or not available for changes, preventing the copying process from completing. Authorization Issues: The user may not have the necessary authorizations to perform the copy operation. Technical Issues: There could be technical issues in the system, such as database locks or system performance problems.
    Solution: To resolve the error, you can take the following steps: Check Data Consistency: Verify that the resource networks in the source planning version are consistent and complete.

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author