How To Fix /SAPAPO/CDPSFUNCPOOL016 - Interrupted operation cannot be stretched/shrunk


/SAPAPO/CDPSFUNCPOOL016 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSFUNCPOOL -

  • Message number: 016

  • Message text: Interrupted operation cannot be stretched/shrunk

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSFUNCPOOL016 - Interrupted operation cannot be stretched/shrunk ?
    The SAP error message /SAPAPO/CDPSFUNCPOOL016 Interrupted operation cannot be stretched/shrunk typically occurs in the context of Advanced Planning and Optimization (APO) within SAP. This error is related to the planning operations in the Supply Chain Management (SCM) module, particularly when dealing with the Capacity Planning or Production Planning functionalities.
    
    Cause: The error indicates that an operation (such as a production order or a planned order) that has been interrupted cannot be adjusted in terms of its duration or capacity. This can happen due to several reasons, including: Resource Constraints: The operation may be linked to a resource that has constraints preventing it from being stretched or shrunk. Order Status: The status of the order may not allow for changes. For example, if the order is already in production or has been confirmed, it may not be possible to adjust its duration. Planning Parameters: The planning parameters set in the system may restrict the ability to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker