How To Fix RU292 - Forecast work of operation exceeds maximum work


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RU - Messages for order completion confirmation

  • Message number: 292

  • Message text: Forecast work of operation exceeds maximum work

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RU292 - Forecast work of operation exceeds maximum work ?

    The SAP error message RU292, which states "Forecast work of operation exceeds maximum work," typically occurs in the context of production planning and scheduling within SAP's Advanced Planning and Optimization (APO) or Production Planning (PP) modules. This error indicates that the forecasted workload for a specific operation exceeds the maximum allowable workload defined in the system.

    Cause:

    1. Excessive Forecast Workload: The forecasted workload for a particular operation is higher than the maximum capacity defined for that operation in the routing or work center.
    2. Incorrect Configuration: The maximum work capacity for the operation may not be set correctly, or the forecast data may be inaccurate.
    3. Capacity Constraints: The system may not have enough capacity to handle the forecasted demand, leading to this error.
    4. Data Entry Errors: There may be errors in the data entry for the forecast or the routing that lead to discrepancies in workload calculations.

    Solution:

    1. Review and Adjust Maximum Work Capacity:

      • Check the maximum work capacity settings for the operation in the routing or work center.
      • If necessary, increase the maximum work capacity to accommodate the forecasted workload.
    2. Validate Forecast Data:

      • Review the forecast data to ensure it is accurate and reflects realistic production needs.
      • Adjust the forecast if it is found to be inflated or incorrect.
    3. Check Routing and Work Center Settings:

      • Ensure that the routing and work center configurations are set up correctly, including the operation times and capacities.
      • Make sure that the operation times are realistic and that they align with the actual production capabilities.
    4. Capacity Planning:

      • Conduct a capacity planning analysis to identify any bottlenecks or constraints in the production process.
      • Consider redistributing workload across different operations or work centers if necessary.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on handling this error in your version of SAP.
    6. Engage with SAP Support:

      • If the issue persists after making adjustments, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like CO01 (Create Production Order), MD04 (Stock/Requirements List), or CM01 (Capacity Planning) to analyze and adjust the relevant data.
    • Capacity Planning: Understanding how capacity planning works in SAP can help prevent this error in the future. Familiarize yourself with concepts like available capacity, planned orders, and production scheduling.
    • User Exits and BAdIs: In some cases, custom logic may be implemented through user exits or BAdIs that could affect how workload is calculated. Review any customizations that may impact this.

    By following these steps, you should be able to resolve the RU292 error and ensure that your production planning processes run smoothly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author