How To Fix RSH_LEVELING026 - Please enter a start date that is within the schedule period.


RSH_LEVELING026 - Overview

  • Message type: E = Error

  • Message class: RSH_LEVELING - Leveling Relevant Messages

  • Message number: 026

  • Message text: Please enter a start date that is within the schedule period.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RSH_LEVELING026 - Please enter a start date that is within the schedule period. ?
    The SAP error message RSH_LEVELING026 indicates that the start date you are trying to enter for a scheduling operation is outside the defined schedule period. This typically occurs in the context of project scheduling or resource leveling in SAP.
    
    Cause: Date Outside Schedule Period: The start date you are entering is either before the defined start date or after the defined end date of the scheduling period. Incorrect Configuration: The scheduling period may not be set correctly in the project or resource settings. User Input Error: The date may have been entered incorrectly, such as a typo or misunderstanding of the date format.
    Solution: Check Schedule Period: Verify the defined schedule period for the project or resource. Ensure that the start date you are trying to enter falls within this period. Navigate to the project or resource settings and check the start and end dates. Adjust Start Date: If the start date you are trying to enter is

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant