How To Fix RSBPCB_EXCEPTION368 - BPF: Validation: Driving dimension &1 is in identity dimensions


SAP Error Message - Details

  • Message type: E = Error

  • Message class: RSBPCB_EXCEPTION - BPC: BPF Message Class

  • Message number: 368

  • Message text: BPF: Validation: Driving dimension &1 is in identity dimensions

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message RSBPCB_EXCEPTION368 - BPF: Validation: Driving dimension &1 is in identity dimensions ?

    The SAP error message RSBPCB_EXCEPTION368 typically occurs in the context of Business Planning and Consolidation (BPC) when there is an issue with the driving dimension in a planning model. The error indicates that the driving dimension specified is part of the identity dimensions, which can lead to validation issues during the planning process.

    Cause:

    1. Driving Dimension Issue: The driving dimension specified in your planning model is not set up correctly or is part of the identity dimensions. Identity dimensions are typically used for mapping and do not have the same characteristics as regular dimensions.
    2. Model Configuration: The configuration of the BPC model may not be aligned with the expected setup for driving dimensions, leading to conflicts during validation.
    3. Data Integrity: There may be issues with the data integrity or relationships between dimensions that are causing the validation to fail.

    Solution:

    1. Check Dimension Configuration:

      • Review the configuration of the driving dimension in your BPC model. Ensure that it is not set as an identity dimension.
      • If it is incorrectly set, you may need to change its configuration in the BPC model settings.
    2. Adjust Model Settings:

      • Go to the BPC model settings and verify the driving dimensions. Ensure that they are correctly defined and not overlapping with identity dimensions.
      • If necessary, redefine the driving dimension to a valid dimension that is not an identity dimension.
    3. Data Validation:

      • Validate the data in your BPC model to ensure that there are no inconsistencies or errors that could be causing the validation to fail.
      • Check for any missing or incorrect mappings between dimensions.
    4. Consult Documentation:

      • Refer to the SAP BPC documentation for specific guidelines on configuring driving dimensions and identity dimensions. This can provide insights into best practices and common pitfalls.
    5. Testing:

      • After making changes, test the model to ensure that the error does not reoccur. Run the validation process again to confirm that the issue has been resolved.

    Related Information:

    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • BPC Community: Engage with the SAP Community or forums where other users may have encountered similar issues and can share their solutions.
    • Training and Resources: Consider additional training or resources on BPC configuration and best practices to prevent similar issues in the future.

    By following these steps, you should be able to resolve the error message RSBPCB_EXCEPTION368 and ensure that your BPC model functions correctly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker