Do you have any question about this error?
Message type: E = Error
Message class: PV - Training and Event Management
Message number: 245
Message text: Enter a valid planning period
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PV245
- Enter a valid planning period ?The SAP error message PV245 "Enter a valid planning period" typically occurs in the context of planning and forecasting within SAP systems, particularly in modules like SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO). This error indicates that the planning period you are trying to enter is either invalid or not recognized by the system.
Causes:
- Invalid Date Format: The date format entered may not match the expected format in the system.
- Out of Range Dates: The planning period may fall outside the defined planning horizon or calendar settings in the system.
- Closed Periods: The period you are trying to enter may be closed for planning, meaning no changes can be made for that time frame.
- Missing Configuration: The planning period may not be configured correctly in the system settings or master data.
- User Authorization: The user may not have the necessary permissions to access or modify the specified planning period.
Solutions:
- Check Date Format: Ensure that the date is entered in the correct format as per the system's requirements.
- Verify Planning Horizon: Check the planning horizon settings in the configuration to ensure that the period you are trying to enter is within the allowed range.
- Review Period Status: Confirm whether the planning period is open for changes. If it is closed, you may need to open it or select a different period.
- Configuration Review: Review the configuration settings related to planning periods in the system to ensure they are set up correctly.
- User Permissions: Check the user roles and authorizations to ensure that the user has the necessary access rights to the planning period in question.
Related Information:
/SAPAPO/SDP94
for SAP APO).If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PV244
Enter a start date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PV243
Maintain the resources first
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PV246
Enter a capacity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PV247
Organizer is already historically recorded
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.