How To Fix PU769 - Transport queue synchronized from &1 to &2


PU769 - Overview

  • Message type: E = Error

  • Message class: PU - Upgrade and Transport Log Messages

  • Message number: 769

  • Message text: Transport queue synchronized from &1 to &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PU769 - Transport queue synchronized from &1 to &2 ?
    The SAP error message PU769 indicates that a transport queue has been synchronized from one system to another. This message typically occurs in the context of transport management within SAP systems, particularly when dealing with transport requests and queues.
    
    Cause: The error message PU769 is not necessarily an error in the traditional sense but rather an informational message indicating that a transport queue has been synchronized. This can happen during the transport process when changes made in one system (like a development system) are being synchronized with another system (like a quality assurance or production system). The message specifies the source system (&1) and the target system (&2) involved in the synchronization.
    Solution: Since PU769 is an informational message, there is generally no action required unless you are experiencing issues with the transport process. However, if you are facing problems related to transport queues, consider the following steps: Check Transport Logs: Review the transport logs

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker