How To Fix PSHLP_MSG_CL129 - Data not saved to the operative project


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PSHLP_MSG_CL - Message Class for PS EhP4 Developments

  • Message number: 129

  • Message text: Data not saved to the operative project

  • Show details Hide details
  • What causes this issue?

    The setting of the <LS>Deletion Flag</> (<NP>DLFL</>) status failed for
    &V1&.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PSHLP_MSG_CL129 - Data not saved to the operative project ?

    The SAP error message PSHLP_MSG_CL129, which states "Data not saved to the operative project," typically occurs in the context of project management within SAP, particularly when working with Project System (PS) modules. This error indicates that there was an issue saving data to an operative project, which can be due to various reasons.

    Causes:

    1. Authorization Issues: The user may not have the necessary authorizations to make changes to the operative project.
    2. Project Status: The project might be in a status that does not allow changes (e.g., "Locked" or "Completed").
    3. Data Inconsistencies: There may be inconsistencies or missing mandatory fields in the data being saved.
    4. System Configuration: There could be configuration settings in the project system that prevent saving data.
    5. Technical Issues: There may be underlying technical issues, such as database locks or system errors.

    Solutions:

    1. Check Authorizations: Ensure that the user has the necessary authorizations to modify the operative project. This can be done by reviewing the user's roles and permissions in the SAP system.
    2. Review Project Status: Check the status of the project. If it is locked or completed, you may need to change its status or unlock it before making changes.
    3. Validate Data: Ensure that all required fields are filled out correctly and that there are no inconsistencies in the data being entered.
    4. Consult Configuration Settings: Review the configuration settings in the Project System to ensure that they allow for the changes you are trying to make.
    5. Check for Technical Issues: Look for any technical issues, such as database locks or system errors. You may need to consult with your SAP Basis team to resolve these issues.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) or CJ02 (Change Project) to navigate and manage projects effectively.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message. SAP Notes can provide specific guidance or fixes for known problems.
    • Documentation: Review SAP documentation related to Project System for best practices and troubleshooting steps.

    If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant