How To Fix PRP_UI005 - Date &1 is invalid


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PRP_UI - Error Messages for PRP User Interface

  • Message number: 005

  • Message text: Date &1 is invalid

  • Show details Hide details
  • What causes this issue?

    The format or value of &v1& is invalid. The date was reset.
    Error occurs:
    &v2& &v3& &v4&

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    How to fix this error?

    Enter a valid date in the correct format.
    The valid date format is displayed in your user settings. Choose:
    <ZK>System</> -> <ZK>User Profile</> -> <ZK>Own Data</> ->
    <LS>Defaults</>.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PRP_UI005 - Date &1 is invalid ?

    The SAP error message PRP_UI005, which states "Date &1 is invalid," typically occurs in the context of planning or scheduling within SAP systems, particularly in modules related to production planning or project management. This error indicates that the date entered in the system is not recognized as valid, which can be due to several reasons.

    Causes:

    1. Incorrect Date Format: The date may not be in the expected format (e.g., DD/MM/YYYY vs. MM/DD/YYYY).
    2. Out of Range Dates: The date may fall outside the permissible range defined in the system settings (e.g., before the start date of a project or after the end date).
    3. System Configuration: The date settings in the system may not be configured correctly, leading to invalid date recognition.
    4. Calendar Settings: The date may not align with the defined working calendar or holiday calendar in the system.
    5. User Input Error: The user may have mistakenly entered an incorrect date.

    Solutions:

    1. Check Date Format: Ensure that the date is entered in the correct format as per the system's regional settings.
    2. Validate Date Range: Verify that the date falls within the acceptable range defined in the system. Check project start and end dates or any other relevant date constraints.
    3. Review System Configuration: Consult with your SAP administrator to ensure that the system settings for date handling are correctly configured.
    4. Check Calendar Settings: Review the working and holiday calendars in the system to ensure that the date aligns with the defined schedules.
    5. Re-enter the Date: If the date was entered incorrectly, re-enter it after confirming its validity.

    Related Information:

    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message. SAP frequently updates its knowledge base with solutions for common errors.
    • Transaction Codes: Familiarize yourself with relevant transaction codes that may help in troubleshooting date-related issues, such as SCAL for calendar settings or SPRO for configuration settings.
    • User Documentation: Refer to user manuals or help documentation specific to the module you are working with for additional guidance on date handling.

    If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author