Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix PRP101 - WFM Core event handling: Project &1 is locked


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PRP - Project Resource Planning: General Messages

  • Message number: 101

  • Message text: WFM Core event handling: Project &1 is locked

  • Show details Hide details
  • What causes this issue?

    Project &V1& is locked by another user. The project assignment cannot be
    changed by WFM Core.

    System Response

    The relevant qRFC remains in the outbound queue.

    How to fix this error?

    Execute the logical unit of work (LUW) again once the project is no
    longer locked.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PRP101 - WFM Core event handling: Project &1 is locked ?

    The SAP error message PRP101 indicates that a project is locked in the context of Work Force Management (WFM) core event handling. This typically occurs when a project is being edited or processed by another user or transaction, preventing other users from making changes or accessing it.

    Cause:

    1. Project Locking: The project is currently locked by another user or process. This can happen if someone is editing the project or if a background job is running that has not yet released the lock.
    2. Incomplete Transactions: If a previous transaction involving the project was not completed properly, it may leave the project in a locked state.
    3. System Issues: Occasionally, system errors or crashes can lead to projects being left in a locked state.

    Solution:

    1. Check Lock Status: Use transaction code SM12 to check for locks on the project. You can see which user or process is holding the lock and take appropriate action.
    2. Release Locks: If you have the necessary authorizations, you can manually release the lock from SM12. Be cautious when doing this, as it may disrupt the work of other users.
    3. Wait and Retry: If the lock is held by another user, you may need to wait until they finish their work and release the lock.
    4. Check Background Jobs: Use transaction code SM37 to check if there are any background jobs that might be locking the project. If a job is stuck, you may need to cancel it.
    5. Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team for assistance.

    Related Information:

    • User Authorizations: Ensure that you have the necessary authorizations to view and manage locks.
    • Documentation: Refer to SAP documentation for more details on project management and locking mechanisms.
    • System Performance: Regularly monitor system performance and job processing to minimize locking issues in the future.
    • Best Practices: Implement best practices for project management in SAP to avoid frequent locking issues, such as scheduling maintenance windows or coordinating with team members.

    By following these steps, you should be able to diagnose and resolve the PRP101 error effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author