How To Fix PRC_PRI211 -


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PRC_PRI - Messages for Pricing Engine

  • Message number: 211

  • Message text:

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PRC_PRI211 - ?

    The SAP error message PRC_PRI211 typically relates to issues in the Project System (PS) module, particularly concerning the planning and budgeting of projects. This error can occur when there are inconsistencies or issues with the project planning data, such as budget availability, planning versions, or other related parameters.

    Cause:

    The PRC_PRI211 error message can be triggered by several factors, including but not limited to:

    1. Budget Availability: The budget for a project may not be available or may have been exceeded.
    2. Planning Version Issues: The planning version being used may not be valid or may not have been activated.
    3. Data Inconsistencies: There may be inconsistencies in the project data, such as missing or incorrect entries in the project definition or WBS elements.
    4. Authorization Issues: The user may not have the necessary authorizations to perform the action related to the project.

    Solution:

    To resolve the PRC_PRI211 error, you can take the following steps:

    1. Check Budget Availability:

      • Verify that the budget for the project is correctly defined and that there are sufficient funds available.
      • Use transaction codes like CJ30 (Project Budgeting) to review and adjust the budget if necessary.
    2. Review Planning Versions:

      • Ensure that the planning version you are using is valid and has been activated.
      • You can check this in the project planning settings or by using transaction codes like CJ02 (Change Project) to review the project settings.
    3. Validate Project Data:

      • Check for any inconsistencies in the project data, such as missing WBS elements or incorrect settings.
      • Use transaction codes like CJ20N (Project Builder) to review the project structure and make necessary corrections.
    4. Check Authorizations:

      • Ensure that the user has the necessary authorizations to perform the actions related to the project.
      • Consult with your SAP security team if you suspect authorization issues.
    5. Consult SAP Notes:

      • Look for any relevant SAP Notes that may address this specific error message. You can search for notes in the SAP Support Portal.
    6. Contact SAP Support:

      • If the issue persists after trying the above solutions, consider reaching out to SAP Support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ01 (Create Work Breakdown Structure), CJ02 (Change Work Breakdown Structure), and CJ30 (Project Budgeting).
    • Documentation: Review SAP documentation related to Project System (PS) for more detailed information on budgeting and planning.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed.

    By following these steps, you should be able to identify and resolve the underlying cause of the PRC_PRI211 error message in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant