How To Fix PPH_DD174 - Replenishment lead time value should be greater than zero


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPH_DD - Messages for Demand Driven

  • Message number: 174

  • Message text: Replenishment lead time value should be greater than zero

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPH_DD174 - Replenishment lead time value should be greater than zero ?

    The SAP error message PPH_DD174, which states "Replenishment lead time value should be greater than zero," typically occurs in the context of inventory management or supply chain processes within SAP. This error indicates that the system has detected a replenishment lead time value that is either zero or not set, which is not acceptable for the replenishment process.

    Cause:

    1. Missing or Incorrect Data: The replenishment lead time is not defined for a material or product in the system. This could be due to data entry errors or incomplete master data.
    2. Configuration Issues: The settings in the material master or the relevant configuration for the replenishment process may not be correctly set up.
    3. Business Logic: The business process may require a lead time to be defined for planning purposes, and having a zero value does not make sense in the context of supply chain management.

    Solution:

    1. Check Material Master Data:

      • Go to the material master record for the affected material (transaction code MM03).
      • Check the "MRP" (Material Requirements Planning) view and ensure that the replenishment lead time is set to a value greater than zero.
      • If it is missing or set to zero, update it with the appropriate lead time.
    2. Review Configuration Settings:

      • If you have access to configuration settings, check the settings related to the replenishment process in the relevant customizing transactions (e.g., SPRO).
      • Ensure that the lead time settings are correctly configured for the relevant planning strategies.
    3. Consult with Business Users:

      • Discuss with the relevant business users or supply chain planners to understand the expected lead time for replenishment and update the system accordingly.
    4. Testing:

      • After making the necessary changes, perform a test to ensure that the error no longer occurs and that the replenishment process works as expected.

    Related Information:

    • Documentation: Refer to SAP documentation or help files related to material master data and replenishment processes for more detailed guidance.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • User Forums: Consider visiting SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By ensuring that the replenishment lead time is set correctly, you should be able to resolve the error message PPH_DD174 and continue with your replenishment processes in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author