How To Fix PPH_DD109 - Proposal run for Product &1, Plant &2, MRP Area &3 already suspended


PPH_DD109 - Overview

  • Message type: E = Error

  • Message class: PPH_DD - Messages for Demand Driven

  • Message number: 109

  • Message text: Proposal run for Product &1, Plant &2, MRP Area &3 already suspended

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPH_DD109 - Proposal run for Product &1, Plant &2, MRP Area &3 already suspended ?
    The SAP error message "PPH_DD109 Proposal run for Product &1, Plant &2, MRP Area &3 already suspended" typically indicates that a proposal run for a specific product in a given plant and MRP area has been suspended. This can occur in the context of production planning and material requirements planning (MRP) processes.
    
    Cause: Previous Suspension: The proposal run may have been previously suspended due to various reasons, such as system errors, manual intervention, or issues with data integrity. Locking Mechanism: SAP uses locking mechanisms to prevent multiple processes from running simultaneously on the same data. If a proposal run is already in progress or has been suspended, a new run cannot be initiated until the previous one is resolved.
    Configuration Issues: There may be configuration settings in the MRP or production planning modules that are causing the proposal run to be suspended.
    Solution: Check Status: Verify the status of the proposal run for the specified product,

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author