How To Fix PPESNP023 - &1 &2 can only have one maximum break for CTM planning


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPESNP - Message Class for SNP Routing

  • Message number: 023

  • Message text: &1 &2 can only have one maximum break for CTM planning

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPESNP023 - &1 &2 can only have one maximum break for CTM planning ?

    The SAP error message PPESNP023 indicates that there is an issue with the configuration of the Capacity Planning in the context of CTM (Capable-to-Match) planning. Specifically, it states that a certain resource (or production line) can only have one maximum break defined, but the system has detected multiple breaks.

    Cause:

    1. Multiple Breaks Defined: The error typically arises when there are multiple maximum breaks defined for a resource in the CTM planning setup. In CTM, a maximum break is a period during which the resource is not available for production, and having more than one defined can lead to conflicts in scheduling.
    2. Configuration Issues: It may also stem from incorrect configuration settings in the planning parameters or master data related to the resource.

    Solution:

    1. Review Break Definitions: Check the break definitions for the resource in question. Ensure that there is only one maximum break defined. You can do this by navigating to the relevant configuration settings in SAP.
    2. Adjust Planning Parameters: If multiple breaks are necessary, consider adjusting the planning parameters or the way breaks are defined. You may need to consolidate breaks or redefine them to fit within the constraints of CTM planning.
    3. Check Resource Master Data: Review the resource master data to ensure that it is correctly set up. Look for any inconsistencies or errors that might lead to this issue.
    4. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on configuring breaks in CTM planning. This can provide insights into best practices and common pitfalls.
    5. Testing: After making adjustments, run a test planning scenario to ensure that the error does not reoccur.

    Related Information:

    • CTM Planning: Capable-to-Match (CTM) is a planning tool in SAP that helps in matching supply and demand while considering constraints like capacity and lead times.
    • Breaks in Planning: Breaks are periods when a resource is not available for production, and they can be defined in various ways (e.g., maintenance, holidays).
    • SAP Notes: Check for any relevant SAP Notes that might address this specific error or provide additional troubleshooting steps.
    • SAP Community: Engaging with the SAP Community forums can also provide insights from other users who may have encountered and resolved similar issues.

    By following these steps, you should be able to resolve the PPESNP023 error and ensure that your CTM planning runs smoothly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author