How To Fix PPESNP023 - &1 &2 can only have one maximum break for CTM planning


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPESNP - Message Class for SNP Routing

  • Message number: 023

  • Message text: &1 &2 can only have one maximum break for CTM planning

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPESNP023 - &1 &2 can only have one maximum break for CTM planning ?
    The SAP error message PPESNP023 indicates that there is an issue with the configuration of the Capacity Planning in the context of CTM (Capable-to-Match) planning. Specifically, it states that a certain resource (or production line) can only have one maximum break defined, but the system has detected multiple breaks.
    
    Cause: Multiple Breaks Defined: The error typically arises when there are multiple maximum breaks defined for a resource in the CTM planning setup. In CTM, a maximum break is a period during which the resource is not available for production, and having more than one defined can lead to conflicts in scheduling.
    Configuration Issues: It may also stem from incorrect configuration settings in the planning parameters or master data related to the resource.
    Solution: Review Break Definitions: Check the break definitions for the resource in question. Ensure that there is only one maximum break defined. You can do this by navigating to the relevant configuration settings

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker