Do you have any question about this error?
Message type: E = Error
Message class: PPESNP - Message Class for SNP Routing
Message number: 015
Message text: The APO resource for resource &1 was not maintained
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPESNP015
- The APO resource for resource &1 was not maintained ?The SAP error message PPESNP015 indicates that a specific APO (Advanced Planning and Optimization) resource has not been maintained or configured properly in the system. This error typically arises in the context of production planning and scheduling when the system attempts to access or utilize a resource that has not been set up correctly.
Cause:
- Resource Not Defined: The resource specified in the error message (&1) has not been created or defined in the APO system.
- Missing Configuration: The resource may exist, but it lacks the necessary configuration or parameters that are required for it to be used in planning.
- Incorrect Resource Type: The resource type may not be compatible with the planning scenario being executed.
- Master Data Issues: There may be issues with the master data related to the resource, such as missing or incorrect data.
Solution:
Check Resource Definition:
- Go to the APO system and check if the resource specified in the error message exists.
- Use transaction codes like
/SAPAPO/RSC1
to view resources in APO.Maintain Resource:
- If the resource does not exist, create it using the appropriate transaction code.
- If it exists but is not maintained, ensure that all necessary fields and parameters are filled out correctly.
Review Resource Configuration:
- Ensure that the resource is configured correctly for the planning scenario. This includes checking capacity, availability, and any other relevant settings.
Check Master Data:
- Verify that all related master data (like production versions, work centers, etc.) is correctly maintained and linked to the resource.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidelines on maintaining resources in APO.
Testing:
- After making the necessary changes, test the planning scenario again to ensure that the error is resolved.
Related Information:
/SAPAPO/RSC1
(Display Resources) and /SAPAPO/RSC2
(Change Resources).By following these steps, you should be able to resolve the PPESNP015 error and ensure that the APO resource is properly maintained for your planning needs.
Get instant SAP help. Start your 7-day free trial now.
PPESNP014
Resource type &1 cannot be used for capacity planning in the SNP plan
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPESNP013
The APO resource &2 at iPPE resource &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPESNP016
No resource has been defined for maintaining cap. reqmts at &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPESNP017
The fixed duration of &1 &2 must contain multiple days
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.