How To Fix PPESNP014 - Resource type &1 cannot be used for capacity planning in the SNP plan


PPESNP014 - Overview

  • Message type: E = Error

  • Message class: PPESNP - Message Class for SNP Routing

  • Message number: 014

  • Message text: Resource type &1 cannot be used for capacity planning in the SNP plan

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPESNP014 - Resource type &1 cannot be used for capacity planning in the SNP plan ?
    The SAP error message PPESNP014 indicates that a specific resource type cannot be used for capacity planning in the Supply Network Planning (SNP) plan. This error typically arises when there is a configuration issue or a mismatch in the resource settings within the SNP environment.
    
    Cause: Resource Type Configuration: The resource type you are trying to use for capacity planning may not be configured correctly in the SNP settings. This could be due to the resource type not being defined as a capacity resource in the SNP planning area. Resource Assignment: The resource may not be assigned to the relevant planning area or may not be included in the SNP planning process. Master Data Issues: There may be issues with the master data related to the resource, such as missing or incorrect settings in the resource master data. Planning Area Settings: The planning area may not be set up to include the resource type in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker