How To Fix PPESET112 - &1 &2 has been separated into &1 &3


PPESET112 - Overview

  • Message type: E = Error

  • Message class: PPESET - Messages for iPPE SET Application

  • Message number: 112

  • Message text: &1 &2 has been separated into &1 &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPESET112 - &1 &2 has been separated into &1 &3 ?
    The SAP error message PPESET112 typically relates to issues in the Production Planning and Detailed Scheduling (PP/DS) module. This error indicates that a certain planning object (like a production order or a planned order) has been separated into two different objects due to a change in the planning parameters or constraints.
    
    Cause: The error message PPESET112 occurs when: A planning object (e.g., a production order) is split into two separate objects because of changes in the planning parameters, such as capacity constraints, resource availability, or scheduling conflicts. This can happen during the planning run when the system determines that it cannot fulfill the requirements with the original object due to these constraints.
    Solution: To resolve this error, you can take the following steps: Review Planning Parameters: Check the planning parameters and constraints that might have led to the separation of the planning object. This includes checking resource availability, capacity, and any other relevant settings. Analyze the Planning Object:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker