Message type: E = Error
Message class: PPEFLO - Messages for iPPE Application Object FLO
Message number: 410
Message text: &1 is not assigned to alternative line &2 (&3) (Assignment created)
A line structure contains lines that are alternative to one another.
The system found line balance relationships to alternative line
structures for the activity &V1&. However, the activity is not assigned
to all alternative lines. The system has found no line balance
relationships for activity &V1& to alternative line &V2& in the group
of alternative lines &V3&.
The system generates a default assignment of the activity to the
alternative lines for the missing assignment. The system can now create
requirements in the Rapid Planning Matrix for the components that are
assigned to this activity. Even if the order runs through one of the
alternative lines for which no line balance relationship exists.
If you have forgotten the missing line balance relationship, you can
create it afterwards.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
PPEFLO410
- &1 is not assigned to alternative line &2 (&3) (Assignment created) ?The SAP error message PPEFLO410 indicates that a specific component or item (identified by &1) is not assigned to an alternative line (identified by &2) in the context of a production planning or process order. This error typically arises in scenarios involving production planning, where alternative lines or components are used to manage different production scenarios or configurations.
Cause: Missing Assignment: The component (e.g., material or part) is not properly assigned to the alternative line in the production order or planning scenario.
Configuration Issues: There may be issues with the configuration of the alternative lines in the production order or the master data setup. Data Inconsistencies: There could be inconsistencies in the data related to the production order, such as missing or incorrect entries in the BOM (Bill of Materials) or routing.
Solution: Check Assignments: Verify that the component (identified by &1) is correctly assigned to the alternative line (identified by &2) in the production order.
Get instant SAP help. Sign up for our Free Essentials Plan.
PPEFLO409
Mode &2 to &3 in line balance &1 results in repeated activity in order
What causes this issue? The line balance relationship mode &V1& to &V2& in line balance &V3& is not allowed. This message wil...
PPEFLO408
Colored material &1 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEFLO411
&1 &2 does not belong to &3 &4 (restricted line network for RPM)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPEFLO412
Mode &1 not relevant
What causes this issue? When exploding a process structure and a line structure (line network) and the corresponding line balances, the system found ...