Do you have any question about this error?
Message type: E = Error
Message class: PPDS_PB - Messages for New Fiori OData Planning Board
Message number: 039
Message text: &1 affected on &2 at &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PPDS_PB039
- &1 affected on &2 at &3 ?The SAP error message PPDS_PB039 typically relates to issues in the Production Planning and Detailed Scheduling (PP/DS) module. This error message indicates that there is a problem with the planning board or the scheduling of a specific resource or product.
Cause:
The error message PPDS_PB039 can be triggered by several factors, including:
- Resource Availability: The resource (machine, labor, etc.) may not be available for the planned production due to maintenance, capacity constraints, or scheduling conflicts.
- Product Configuration: The product being scheduled may have configuration issues, such as missing master data or incorrect settings in the material master.
- Planning Parameters: Incorrect planning parameters or settings in the PP/DS configuration can lead to scheduling issues.
- Data Consistency: There may be inconsistencies in the data related to the production order, such as missing or incorrect information in the order or related master data.
Solution:
To resolve the PPDS_PB039 error, you can take the following steps:
- Check Resource Availability: Verify the availability of the resource mentioned in the error message. Ensure that it is not blocked or scheduled for maintenance during the planned production time.
- Review Product Master Data: Check the material master data for the product involved. Ensure that all necessary data is correctly maintained, including production versions, BOMs, and routing.
- Adjust Planning Parameters: Review the planning parameters in the PP/DS settings. Ensure that they are correctly configured to allow for proper scheduling.
- Analyze the Planning Board: Use the planning board to analyze the scheduling of the affected resource or product. Look for any conflicts or issues that may be causing the error.
- Check for Data Consistency: Ensure that all related data (production orders, planned orders, etc.) is consistent and correctly maintained. Look for any discrepancies that may need to be resolved.
- Consult SAP Notes: Check the SAP Support Portal for any relevant notes or updates related to this error message. There may be specific patches or updates that address known issues.
Related Information:
/SAPAPO/SDP94
(Planning Board) or /SAPAPO/PPDS
(PP/DS) to analyze and troubleshoot the issue.If the issue persists after following these steps, it may be beneficial to involve your SAP support team or consult with an SAP expert for further assistance.
Get instant SAP help. Start your 7-day free trial now.
PPDS_PB038
&1 for &2 successful
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPDS_PB037
Simulation does not exist. Please reload the app, then try again.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPDS_PB040
&1 for &2 unsuccessful
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PPDS_PB041
&1 is successful
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.