How To Fix PPDS_PB012 - Alternate resources loaded successfully


PPDS_PB012 - Overview

  • Message type: E = Error

  • Message class: PPDS_PB - Messages for New Fiori OData Planning Board

  • Message number: 012

  • Message text: Alternate resources loaded successfully

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPDS_PB012 - Alternate resources loaded successfully ?
    The SAP error message PPDS_PB012, which states "Alternate resources loaded successfully," typically occurs in the context of SAP Advanced Planning and Optimization (APO) or SAP Integrated Business Planning (IBP) when dealing with production planning and scheduling. This message indicates that the system has successfully loaded alternate resources for a particular planning scenario.
    
    Cause: Resource Configuration: The error message is not necessarily an error but rather an informational message indicating that alternate resources have been successfully loaded. This can happen when the system is configured to use alternate resources for production planning. Planning Scenario: It may occur during the execution of a planning run where alternate resources are defined for certain operations or products. Data Consistency: The message can also indicate that the system has found and loaded the alternate resources as per the defined planning parameters.
    Solution: Since this message is informational rather than an error, no specific corrective action is typically required. However, if you

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant