How To Fix PPDS_PB010 - The planning period does not lie within the evaluation period


PPDS_PB010 - Overview

  • Message type: E = Error

  • Message class: PPDS_PB - Messages for New Fiori OData Planning Board

  • Message number: 010

  • Message text: The planning period does not lie within the evaluation period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPDS_PB010 - The planning period does not lie within the evaluation period ?
    The SAP error message PPDS_PB010 ("The planning period does not lie within the evaluation period") typically occurs in the context of SAP Advanced Planning and Optimization (APO) or SAP Integrated Business Planning (IBP) when there is a mismatch between the planning period you are trying to evaluate and the defined evaluation period.
    
    Cause: Mismatch in Dates: The planning period you are trying to use for your planning run does not fall within the defined evaluation period. This can happen if: The start date of the planning period is before the start date of the evaluation period. The end date of the planning period is after the end date of the evaluation period.
    Configuration Issues: There may be issues with the configuration of the planning area or the planning book settings that define the evaluation period. Data Entry Errors: Incorrect data entry when setting up the planning run or the planning book can lead to this error.
    Solution: Check

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant