How To Fix PPDS_PB009 - Enter a start date that is earlier than the finish date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PPDS_PB - Messages for New Fiori OData Planning Board

  • Message number: 009

  • Message text: Enter a start date that is earlier than the finish date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPDS_PB009 - Enter a start date that is earlier than the finish date ?

    The SAP error message PPDS_PB009 indicates that there is an issue with the scheduling of a production order or planning activity in the SAP Advanced Planning and Optimization (APO) system, specifically within the Production Planning and Detailed Scheduling (PP/DS) module. The error message states that the start date entered is earlier than the finish date, which is logically incorrect.

    Cause:

    The error typically arises from one of the following scenarios:

    1. Incorrect Date Entry: The user has manually entered a start date that is later than the finish date.
    2. System Calculations: The system may have calculated the start date based on certain parameters or constraints, leading to an inconsistency with the finish date.
    3. Data Migration Issues: If data has been migrated from another system or if there are inconsistencies in the master data, it may lead to incorrect date settings.
    4. Planning Parameters: The planning parameters or settings in the system may not be configured correctly, leading to scheduling conflicts.

    Solution:

    To resolve the error, you can take the following steps:

    1. Check Date Entries: Review the start and finish dates entered for the production order or planning activity. Ensure that the start date is indeed earlier than the finish date.

    2. Adjust Dates: If the dates are incorrect, modify the start date to be earlier than the finish date. This can usually be done in the relevant transaction or planning screen.

    3. Review Planning Parameters: Check the planning parameters and settings in the system to ensure they are configured correctly. This includes checking lead times, production durations, and any constraints that may affect scheduling.

    4. Consult Logs: If the error persists, consult the system logs or error messages for additional context that may help identify the root cause.

    5. Data Consistency Check: If the issue is suspected to be due to data migration or inconsistencies, perform a data consistency check to identify and rectify any discrepancies.

    6. Seek Help from IT Support: If you are unable to resolve the issue, consider reaching out to your IT support team or SAP consultant for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as /SAPAPO/SDP94 (for planning board) or /SAPAPO/PPDS (for detailed scheduling) to navigate the system effectively.
    • Documentation: Refer to SAP documentation or help files for detailed information on date handling and scheduling in PP/DS.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, providing insights or solutions from other users' experiences.

    By following these steps, you should be able to identify and correct the issue causing the PPDS_PB009 error message.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker