How To Fix PPDS_PB009 - Enter a start date that is earlier than the finish date


PPDS_PB009 - Overview

  • Message type: E = Error

  • Message class: PPDS_PB - Messages for New Fiori OData Planning Board

  • Message number: 009

  • Message text: Enter a start date that is earlier than the finish date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPDS_PB009 - Enter a start date that is earlier than the finish date ?
    The SAP error message PPDS_PB009 indicates that there is an issue with the scheduling of a production order or planning activity in the SAP Advanced Planning and Optimization (APO) system, specifically within the Production Planning and Detailed Scheduling (PP/DS) module. The error message states that the start date entered is earlier than the finish date, which is logically incorrect.
    
    Cause: The error typically arises from one of the following scenarios: Incorrect Date Entry: The user has manually entered a start date that is later than the finish date. System Calculations: The system may have calculated the start date based on certain parameters or constraints, leading to an inconsistency with the finish date. Data Migration Issues: If data has been migrated from another system or if there are inconsistencies in the master data, it may lead to incorrect date settings. Planning Parameters: The planning parameters or settings in the system may not be configured correctly, leading to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author