How To Fix PPDS_CUO031 - Rate of resource utilization for &1 must be between 10% and 400%


PPDS_CUO031 - Overview

  • Message type: E = Error

  • Message class: PPDS_CUO - Message class for Capacity Utilization

  • Message number: 031

  • Message text: Rate of resource utilization for &1 must be between 10% and 400%

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PPDS_CUO031 - Rate of resource utilization for &1 must be between 10% and 400% ?
    The SAP error message PPDS_CUO031 indicates that the rate of resource utilization for a specific resource (denoted by &1) is outside the acceptable range of 10% to 400%. This error typically occurs in the context of Production Planning and Detailed Scheduling (PP/DS) when trying to schedule or plan production activities.
    
    Cause: Incorrect Resource Configuration: The resource may be configured with an incorrect utilization rate, which could be due to manual entry errors or incorrect settings in the resource master data. Capacity Planning Issues: The planned production quantities or the scheduling of operations may lead to unrealistic utilization rates that exceed the defined limits. Data Entry Errors: There may be errors in the data entered for production orders, such as incorrect quantities or times that lead to high utilization rates. Resource Constraints: The resource may not have enough capacity to handle the planned workload, leading to utilization rates that fall outside the acceptable range.
    Solution: Check Resource Configuration:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant