Do you have any question about this error?
Message type: E = Error
Message class: PPC1PR - Abarbeitung der ERP-Prozesse
Message number: 516
Message text: Time exceeded for &1 (waiting for confirmation of all processes)
This error message has been triggered because one of the following
errors has occured; see messages
<DS:NA.PPC1PR514>PPC1PR 514</>
<DS:NA.PPC1PR515>PPC1PR 515</>
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
INCLUDE NA_SACHVERHALT OBJECT DOKU ID TX LANGUAGE EN
Error message extract from SAP system. Copyright SAP SE.
PPC1PR516
- Time exceeded for &1 (waiting for confirmation of all processes) ?The SAP error message PPC1PR516, which states "Time exceeded for &1 (waiting for confirmation of all processes)," typically occurs in the context of production planning and control, particularly when dealing with process orders or production orders. This error indicates that the system is waiting for confirmation from all relevant processes, but the expected confirmation has not been received within a specified time frame.
Causes:
- Long Processing Times: The processes involved may be taking longer than expected to complete, leading to a timeout.
- System Performance Issues: High system load or performance bottlenecks can delay the processing of confirmations.
- Configuration Issues: Incorrect settings in the production planning configuration may lead to delays in confirmations.
- Network Issues: If the system is distributed or relies on external systems, network latency or failures can cause delays.
- User Errors: Users may not have confirmed the processes in a timely manner, or there may be issues with the user interface.
Solutions:
- Check Process Status: Verify the status of the processes that are supposed to send confirmations. Ensure they are running and not stuck.
- Increase Timeout Settings: If the processes are expected to take longer, consider increasing the timeout settings in the system configuration.
- Monitor System Performance: Use transaction codes like ST03N or SM66 to monitor system performance and identify any bottlenecks.
- Review Configuration: Check the configuration settings related to production planning and confirm that they are set up correctly.
- User Training: Ensure that users are trained on the correct procedures for confirming processes to avoid delays.
- Check for Network Issues: If applicable, investigate any network issues that may be affecting communication between systems.
Related Information:
If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP Basis or technical support team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
PPC1PR515
Time exceeded for &1 (maximum number of free processes)
What causes this issue? The queue time was exceeded while waiting for free editing process capacity.System Response The system issues an error messa...
PPC1PR514
Time exceeded for &1 with &2
What causes this issue? The defined <DS:DE.PPC_MWWAITTIME>queue time</><LS> </>has been exceeded while waiting for free syste...
PPC1PR517
Error in posting request; no documents were created
What causes this issue? The failed posting cannot be processed again. Details can be displayed using SM13.System Response The system issues an error...
PPC1RA001
No reprocessing records were found for the activities
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.