Message type: E = Error
Message class: PPC1PR - Abarbeitung der ERP-Prozesse
Message number: 514
Message text: Time exceeded for &1 with &2
The defined
<DS:DE.PPC_MWWAITTIME>queue time</><LS> </>has been exceeded while
waiting for free system resources for the evaluation of the goods
movements. System resources have not been available.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Increase the queue time for available resources on the entry screen
(transaction
<DS:TRAN.PPCGO>PPCGO</>).
If this error occurs frequently, your system does not have enough
resources available.
Error message extract from SAP system. Copyright SAP SE.
The SAP error message PPC1PR514 "Time exceeded for &1 with &2" typically occurs in the context of production planning or process order management. This error indicates that a certain time limit has been exceeded for a specific operation or process, which can lead to issues in scheduling or execution.
Cause: Time Limit Exceeded: The error usually arises when a process or operation takes longer than the predefined time limit set in the system. This could be due to various reasons such as: Inefficient production processes. Resource constraints (e.g., machine breakdowns, lack of materials). Incorrect time estimates in the routing or work center. Delays in preceding operations.
Configuration Issues: There may be configuration settings in the production planning module that are not aligned with the actual production processes. Data Issues: Incorrect or incomplete data in the master data (like routing, work centers, or production orders) can also lead to this error.
Solution: Review Time Settings: Check the time settings in the
Get instant SAP help. Sign up for our Free Essentials Plan.
PPC1PR513
System error for &1 &2 with &3
What causes this issue? An internal system failure has occured when processing the <DS:GLOS.3526AFF8AFAB52B9E10000009B38F974>RFC functions</...
PPC1PR512
Communication error for &1 &2 with &3
<LS>&CAUSE&</> A communication error has occured with the <DS:GLOS.3526AFF8AFAB52B9E10000009B38F974>RFC communication</&...
PPC1PR515
Time exceeded for &1 (maximum number of free processes)
What causes this issue? The queue time was exceeded while waiting for free editing process capacity.System Response The system issues an error messa...
PPC1PR516
Time exceeded for &1 (waiting for confirmation of all processes)
What causes this issue? This error message has been triggered because one of the following errors has occured; see messages <DS:NA.PPC1PR514>PP...
Click on this link to search all SAP messages.