Do you have any question about this error?
Message type: E = Error
Message class: /PM0/ABR_PM_ERRORS -
Message number: 148
Message text: Main iteration falied (&2 steps reached)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/PM0/ABR_PM_ERRORS148
- Main iteration falied (&2 steps reached) ?The SAP error message
/PM0/ABR_PM_ERRORS148 Main iteration failed (&2 steps reached)
typically occurs in the context of the SAP Plant Maintenance (PM) module, particularly when dealing with maintenance planning or scheduling. This error indicates that the system was unable to complete the main iteration process, which is often related to planning or scheduling tasks.Causes:
- Data Inconsistencies: There may be inconsistencies in the master data, such as equipment, functional locations, or maintenance plans.
- Configuration Issues: Incorrect configuration settings in the maintenance planning or scheduling parameters can lead to this error.
- Resource Constraints: If there are not enough resources (e.g., personnel, tools, or materials) available for the planned maintenance activities, the iteration may fail.
- Incorrect Time Settings: Issues with the time settings, such as overlapping maintenance windows or incorrect duration settings, can also cause this error.
- System Performance: If the system is under heavy load or if there are performance issues, it may not be able to complete the iterations in a timely manner.
Solutions:
- Check Master Data: Review the master data for any inconsistencies or missing information. Ensure that all relevant data (equipment, functional locations, maintenance plans) is correctly maintained.
- Review Configuration: Verify the configuration settings in the maintenance planning and scheduling areas. Ensure that all parameters are set correctly and align with your business processes.
- Resource Availability: Check the availability of resources required for the maintenance tasks. Ensure that there are enough personnel, tools, and materials allocated for the planned activities.
- Adjust Time Settings: Review the time settings for the maintenance plans and ensure that there are no conflicts or overlaps. Adjust the durations and scheduling parameters as necessary.
- System Performance: Monitor the system performance and check for any bottlenecks. If the system is under heavy load, consider optimizing performance or scheduling maintenance tasks during off-peak hours.
Related Information:
IP10
(Schedule Maintenance Plan) or IP30
(Maintenance Plan Overview) to analyze and manage maintenance plans.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/PM0/ABR_PM_ERRORS136
Transfer life ins. status not permitted from &1 to &2
What causes this issue? An error occurred during calculation in Product Engine (msg.PM).System Response The calculation cannot be carried out.How to...
/PM0/ABR_PM_ERRORS135
Premium exemption is not currently possible; reserve missing
What causes this issue? There is not sufficient reserve for a waiver of premium.System Response The calculation cannot be carried out.How to fix thi...
/PM0/ABR_PM_ERRORS149
Calculation of payment premium failed (&2 steps reached)
What causes this issue? An error occurred during calculation in Product Engine (msg.PM).System Response The calculation cannot be carried out.How to...
/PM0/ABR_PM_ERRORS150
Calculation of tariff additional payment failed (&2 steps reached)
What causes this issue? An error occurred during calculation in Product Engine (msg.PM).System Response The calculation cannot be carried out.How to...
Click on this link to search all SAP messages.