How To Fix PK656 - Production order update violated budget check


PK656 - Overview

  • Message type: E = Error

  • Message class: PK - Production - KANBAN

  • Message number: 656

  • Message text: Production order update violated budget check

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PK656 - Production order update violated budget check ?
    The SAP error message PK656, which states "Production order update violated budget check," typically occurs when there is an attempt to post costs to a production order that exceeds the budget allocated for that order. This is a part of the budget control mechanism in SAP, which is designed to prevent overspending.
    Causes:
    
    Budget Exceeded: The most common cause is that the costs being posted to the production order exceed the budget that has been set for that order.
    Incorrect Budget Settings: The budget may not have been set up correctly, or the budget amount may be too low for the expected costs.
    Cost Overruns: Unexpected increases in material costs, labor, or overhead can lead to exceeding the budget.
    
    Configuration Issues: There may be issues with the configuration of the budget control settings in the system. Solutions: Review the Budget: Check the budget assigned to the production order. If necessary, increase the budget to accommodate the expected

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author