Do you have any question about this error?
Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 568
Message text: Control cycle released prior to planned release date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PK568
- Control cycle released prior to planned release date ?The SAP error message PK568, which states "Control cycle released prior to planned release date," typically occurs in the context of production planning and control cycles in SAP. This error indicates that there is an attempt to release a control cycle before its planned release date, which can disrupt the scheduling and planning processes.
Cause:
- Control Cycle Configuration: The control cycle has a planned release date that is set in the future, and the system is trying to release it before that date.
- Incorrect Date Settings: The system date may be set incorrectly, or the planned release date may not have been updated properly.
- Manual Release Attempt: A user may be attempting to manually release the control cycle without considering the planned release date.
Solution:
Check Control Cycle Dates:
- Navigate to the control cycle in question and verify the planned release date.
- Ensure that the current date is on or after the planned release date.
Adjust the Planned Release Date:
- If necessary, adjust the planned release date to a date that is earlier than or equal to the current date.
- This can be done in the control cycle configuration settings.
Review System Date:
- Ensure that the system date is correct. If the system date is incorrect, it may lead to confusion regarding the planned release date.
Consult Documentation:
- Review SAP documentation or help files related to control cycles and their release processes for additional guidance.
User Training:
- Ensure that users involved in the release process are trained on the importance of planned release dates and how to manage them effectively.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP Notes for any specific patches or updates related to this error message.
Get instant SAP help. Start your 7-day free trial now.
PK567
You must not change the release date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
PK566
Shift sequence necessary in case of sub-day replenishment lead time
What causes this issue? In the case of a sub-day replenishment lead time, a shift sequence is necessary.System Response The system issues an error m...
PK569
Authorization check for kanban status change not possible
What causes this issue? The <LS>Kanban Status</>, <LS>Control Cycle</>, <LS>Plant</> and <LS> Production Su...
PK570
Define a planning work center
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...