How To Fix PK328 - Assignment btwn SD sched.agreement item and control cycle is not specific


SAP Error Message - Details

  • Message type: E = Error

  • Message class: PK - Production - KANBAN

  • Message number: 328

  • Message text: Assignment btwn SD sched.agreement item and control cycle is not specific

  • Show details Hide details
  • What causes this issue?

    Several scheduling agreements have been found.

    System Response

    The IDoc-processing has been terminated.

    How to fix this error?

    Process the IDoc in the workflow-inbox. Limit the selection by
    entering further fields (e.g. <LS>ABLAD</>).

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message PK328 - Assignment btwn SD sched.agreement item and control cycle is not specific ?

    The SAP error message PK328, which states "Assignment between SD scheduling agreement item and control cycle is not specific," typically occurs in the context of production planning and control when there is an issue with the assignment of scheduling agreements to control cycles in the SAP system. This error can arise in various scenarios, particularly when dealing with the integration of Sales and Distribution (SD) and Production Planning (PP) modules.

    Cause:

    1. Missing or Incorrect Assignment: The scheduling agreement item may not be correctly assigned to a control cycle. This can happen if the control cycle is not defined for the material or if the scheduling agreement item does not match the expected criteria.
    2. Multiple Control Cycles: If there are multiple control cycles for the same material, the system may not be able to determine which control cycle to use, leading to ambiguity.
    3. Data Inconsistencies: There may be inconsistencies in the master data, such as material master records, vendor master records, or scheduling agreement settings.
    4. Configuration Issues: Incorrect configuration in the system related to the integration of SD and PP modules can also lead to this error.

    Solution:

    1. Check Control Cycle Assignment: Verify that the scheduling agreement item is correctly assigned to a control cycle. You can do this by checking the control cycle settings in the SAP system.
    2. Review Scheduling Agreement: Ensure that the scheduling agreement is correctly set up and that the item categories and other relevant settings are appropriate.
    3. Check for Multiple Control Cycles: If there are multiple control cycles for the same material, ensure that the correct one is being used. You may need to adjust the settings to make the assignment more specific.
    4. Master Data Review: Review the master data for the material and vendor to ensure that all relevant information is accurate and complete.
    5. Configuration Check: If the issue persists, review the configuration settings in the SAP system related to the integration of SD and PP. This may involve checking the settings in SPRO (SAP Project Reference Object) for both modules.
    6. Consult Documentation: Refer to SAP documentation or notes related to this error message for additional guidance and troubleshooting steps.

    Related Information:

    • Transaction Codes: You may use transaction codes like MD04 (Stock/Requirements List) or ME33K (Display Scheduling Agreement) to analyze the scheduling agreement and its assignments.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert who specializes in SD and PP integration.

    By following these steps, you should be able to identify the root cause of the PK328 error and implement the necessary solutions to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant