Do you have any question about this error?
Message type: E = Error
Message class: PK - Production - KANBAN
Message number: 309
Message text: You have changed the supply area in the control cycle
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
PK309
- You have changed the supply area in the control cycle ?The SAP error message PK309, which states "You have changed the supply area in the control cycle," typically occurs in the context of Production Planning (PP) and is related to the control cycle configuration in the SAP system. This error indicates that there has been a modification to the supply area associated with a control cycle, which can lead to inconsistencies or issues in the planning process.
Cause:
- Supply Area Change: The primary cause of this error is that the supply area linked to a control cycle has been altered. This could happen due to changes in the master data, such as the material master or the control cycle settings.
- Inconsistent Data: Changing the supply area may lead to inconsistencies in the planning data, as the system expects certain relationships and configurations to remain intact.
- Control Cycle Configuration: The control cycle may have been set up with specific parameters that are now invalid due to the change in the supply area.
Solution:
- Review Changes: Check the changes made to the supply area in the control cycle. Ensure that the new supply area is valid and correctly configured.
- Revert Changes: If the change was not intended, consider reverting to the previous supply area configuration to resolve the error.
- Adjust Control Cycle: If the change is necessary, you may need to adjust the control cycle settings to accommodate the new supply area. This may involve updating related master data or reconfiguring the control cycle.
- Consistency Check: Perform a consistency check on the control cycle and related master data to ensure that all configurations are aligned and valid.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on managing control cycles and supply areas.
Related Information:
PK05
(for control cycle maintenance) or MD04
(for stock/requirements list) to investigate and resolve the issue.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in Production Planning.
Get instant SAP help. Start your 7-day free trial now.
PK308
The stor. locs of previous supply area &1 and supply area &2 must match
What causes this issue? You have changed the supply area in the control cycle. At the same time the storage locations of the old and new supply area...
PK307
The bulk material ind. in the material master does not suit this strategy
What causes this issue? You have set the material bulk indicator in the material master. This means that the material is consumed at cost center. H...
PK310
The outline agreement item must be assigned to an account
What causes this issue? You have selected a replenishment strategy, in which the material is to be replenished at cost center. The outline agreement...
PK311
The outline agt item must be fully assigned to an account at cost center
What causes this issue? You have selected a replenishment strategy, in which the material is to be replenished at cost center. The outline agreement ...
Click on this link to search all SAP messages.